Phase I
  Phase II

Corey Lang
Project Consultant
3810 Valley Commons Drive, Suite 4
Bozeman, Montana 59718
406.599.1479

Jeff Ebert
MDT Butte District Administrator
3751 Wynne Avenue
Butte, MT 59702
406.494.9600

Miki Lloyd
MDT Consultant Project Engineer
2701 Prospect Ave
Helena, MT 59620
406.444.9200

Butte Interstate Traffic Study Documents

Butte Interstate Traffic Study - Phase 1 Report

Appendix A - Geometric Features
Intersection Schematics
Geometry Spreadsheets

Truck Turning Movements
Continental Dr 1 | 2
Harrison 1 | 2 | 3
Montana Street 1 | 2
Rocker 1 | 2

Existing Geometry Features
Continental Dr
East Butte
Excelsior
Harrison 1 | 2
Mainline 1 | 2 | 3 | 4 | 5 | 6
Montana Street 1 | 2
Rocker 1 | 2

Appendix B - Safety Analysis
Crash Summaries
Lighting & Safety

Appendix C - Existing Traffic Analysis
Existing Traffic Counts
Existing Conditions Traffic Information
Signal Warrant Analysis Worksheets

Appendix D - Future Traffic Analysis
Future Conditions Traffic

Appendix E - Noise Study
Noise Study
Noise Study Data

Noise Study Locations Map
Detailed Area maps 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11