| Toston Missouri River Corridor Planning Study |
|
· Study Description · Schedule · Data & Figures · Documents/Newsletters · FAQs · Related Links |
| Contacts |
|
Carol Strizich MDT Project Manager 2960 Prospect Ave P.O. Box 201001 Helena, MT 59620-1001 406.444.9240 Jeff Ebert MDT Butte Administrator 3751 Wynne P.O. Box 3068 Butte, MT 59702-3068 406.494.9600 Jeff Key, P.E. CDM Project Manager 406.441.1400 Gail Vennes Broadwater County Commission PO Box 489 Townsend, MT 59644 406.266.9203 |
This map shows the study area via an aerial photograph for the Toston Missouri River Crossing Corridor Planning Study. The graphic shows the beginning and ending termini of the project along U.S. Highway 287.
Project Study Area| Title | Figure |
| Surface Waters and Floodplain | 3-1 |
| Irrigation Systems | 3-2 |
| Cultural Resources and Recreation | 3-3 |
| Wildlife Corridor Areas | 3-4 |
| Animal Species of Concern | 3-5 |
| Potential Wetlands | 3-7 |
| Land Use | 3-8 |
| Hazardous Material in the Project Study Area | 3-9 |
| Farmland and Soils | 3-10 |
| Geology | 3-11 |
| Weighted Overlay Results | 7-2 |
| Possible Corridor Areas | 7-5 |
| West Corridor Area | 7-6 |
| Central Corridor Area | 7-7 |
| East Corridor Area | 7-8 |