The Montana Department of Transportation (MDT) submitted a RAISE grant application in February 2024 and an MPDG (INFRA and Rural) grant application in May 2024 to fund the Lockwood Interchange Reconstruction project, part of a network of projects including in the Billings Bypass. Construction work will replace the existing Interstate 90 (I-90) interchange with the innovative diverging diamond interchange (DDI), increase two miles of I-90 from two lanes to three between interchanges, construct a 10-foot multi-use (MU) path and 5-foot sidewalk to provide complete pedestrian connectivity from Lockwood to the City of Billings, and improve associated roads to accommodate the new interchange and MU path. Links are provided below for additional project and grant information:
- Preliminary Field Review
- Alignment and Grade Report
- Scope of Work Report
- Initial Site Assessment & Hazardous Materials Investigation Report
- Environmental Engineering Analysis Report
- Biological Resource Report/Preliminary Biological Assessment
- Geotechnical and Materials Report/Logs of Boring/Groundwater Observations
- Noise Analysis Report
- Addendum #1 to Biological Resource Report/Preliminary Biological Assessment
- Air Quality Conformity Analysis