Project Overview

The Montana Department of Transportation (MDT) is improving Interstate 90 near St. Regis. The project begins about one mile east of Ward Creek Road (Exit 26) and ends approximately 1 ½ miles east of the St. Regis Interchange (Exit 33). MDT will rejuvenate approximately seven miles of concrete pavement, repair shoulders, and resurface the St. Regis Interchange ramps (Exit 33) and the Two Mile Road Interchange ramps (Exit 30). Construction began in April 2021 and is anticipated to be substantially completed in Fall 2021. Some minor work may need to be completed in 2022.

I90 St Regis map

This section of I 90 was constructed in the late 1970’s. Over the years, the concrete panels have shifted and settled causing small gaps in the surface. MDT will rehabilitate the roadway using a construction process called a “Dowel Bar Retrofit”. This process will improve roadway conditions by providing a smoother driving surface and extending the life of the pavement 10-15 years.

Dowel Bar Retrofit Process

The dowel bar retrofit process ties the concrete roadway panels together to handle heavy loads better and helps prevent further shifting or cracking of the concrete. Crews will cut grooves into the concrete surface between two panels, insert steel dowel bars, and reseal the grooves with new concrete. The dowel bars add strength and durability to the panels. Once the dowel bar work is completed, crews will grind down the concrete surface (mill) and smooth it out.

I90 St Regis dowel bars

What to expect during construction

For the safety of the public and construction workers, MDT encourages motorists to plan ahead, allow extra travel time, slow down and use caution through work zones on Interstate 90. Current construction information and road conditions can be found on the MDT Travel Info App at https://roadreport.mdt.mt.gov/travinfomobile/.

During construction:

  • Traffic will be reduced to one lane in each direction.
  • Both east and westbound traffic will travel on the same side of I 90.
  • Crossover traffic patterns will be in place during construction.
  • Speed limits will be reduced.
  • Wide loads will be staged and piloted, Monday – Thursday.

The Two Mile Road Interchange Ramp (Exit 30) will be temporarily closed twice to allow crews to repave the interchange on and off-ramps. Traffic will be detoured to the next closest exit.

During work on the westbound on and off-ramps:

  • The eastbound on and off-ramps will remain open to traffic.
  • Westbound traffic will detour to the Drexel Interchange (Exit 25), return to I 90 traveling eastbound, and exit at the Two Mile Interchange (about 9 miles).

During work on the eastbound on and off-ramps:

  • The westbound on and off-ramps will remain open to traffic.
  • Eastbound traffic will detour to the St. Regis Interchange (Exit 33), return to I 90 traveling westbound, and exit at the Two Mile Interchange (about 7 miles).

I90 St Regis slow for the cone

Stay Informed During Construction

MDT will notify the public about traffic impacts and work activities through the project website, local media, mailings, social media, and email and text notifications during construction. Questions and comments can be directed to Brandon Coates via email Brandon@rbci.net or call the project hotline at (406) 369-6205.

UPN 9534000