Project Overview

The US 2-Culbertson project builds upon previous and ongoing roadway improvements in Roosevelt County to improve safety, pedestrian accessibility, drainage, and roadway conditions in the heart of Culbertson. The project will reconstruct approximately 1.3 miles of US 2 from Diamond Creek Crossing easterly through the community to connect to the recent highway reconstruction near the Clover Creek bridge crossing.

In addition to rehabilitating the road surface, the project would install curb, gutter, storm drainage, and sidewalk throughout the more urban areas on US 2.

image of puddle on road
US 2-Culbertson - Puddle on Road
Click on the image for a larger view

Timeline

Montana Department of Transportation (MDT) is in the final design phase for this project and intends to have it ready for construction as early as spring 2022, pending available funding and design completion.

To ensure local needs are thoroughly considered on this project, MDT and their consultant have communicated with residences and businesses with frontage along the project, the Culbertson Town Council and school administration, and other interested stakeholders.

US 2-Culbertson Map
US 2-Culbertson Map
Click on the image for a larger view

UPN 8534000