Dodson South Canal logo

How is this project being funded?

Funding for this project is through the Surface Transportation Block Grant Program, administered by the Federal Highway Administration (FHWA), which provides funding to states and localities for transportation improvement projects.

Who is working on this project?

This project is a joint effort between the Montana Department of Transportation (MDT), FHWA, Phillips County, the Bureau of Reclamation, and other local, state, and federal resource agencies. Wickens Construction has been selected as the prime contractor for this project.

Why does the Dodson South Canal bridge need to be replaced?

The substructure of the existing bridge is deteriorating, which will compromise the safety of the route in the long term.

When were the existing bridges built?

This section of roadway, including the bridges, was constructed in 1954.

Will additional right-of-way be needed for the project?

No, all work will be contained within the existing right-of-way.

Who can I contact with other questions or comments?

Feel free to call 877-623-2663 or email dodsonsouthcanalXYZdowlABCcom with any questions or comments.