TitleSpecialRevised
Contract Administration
Heading and Project Description 102-1 04/28/2022
Contract-Documents 102-2 06/09/2022
Mandatory Pre-Bid Conference 102-2a 11/19/2020
Mandatory Pre-Bid Conference (Tribal) 102-2b 11/19/2020
Disadvantaged Business Enterprises (DBE) Requirements 102-3 01/18/2018
DBE Quotes 102-4 03/10/2016
Labor Requirements 102-5 09/05/2019
Certified Payroll Compliance Electronic Payroll Submission 102-5a 03/12/2020
Training Program 102-6 07/15/2021
DBE Usage 102-10 02/13/2020
Bid Withdrawal 102-11 06/09/2022
Alternate Bid Items 102-15 02/27/2014
Soil Boring Information 102-21 01/16/2014
Award of Contract (Local Concurrence) 103-1 10/08/2015
Bidder’s Proposed Aggregate Source(s) 103-10 04/28/2022
Escrow of Bid Documents 103-12 04/28/2022
Escrow of Bid Documents 103-12a 04/28/2022
Contractor Surveying and Layout–Department Staking 105-1 07/10/2014
Partnering Level I 105-6 02/25/2021
Partnering Level II 105-7 02/25/2021
Steel Price Adjustment 106-1 04/28/2022
Prospected Sources 106-3 07/24/2008
Indian Reservation Work 107-1 08/11/2022
Reservation Requirements 107-2 02/27/2014
Montana Made Goods 107-5 10/11/2012
State Preference 107-7 01/01/2003
Hold Harmless 107-11 02/27/2014
Railroad Flagging 107-13 09/08/2022
Environmental
Protection of Storm Water Drainage System and Compliance with Local Permit Requirements 208-2 09/09/2021
Contaminated Soil 208-4 09/09/2021
Montana Floodplain and Floodway Management Act 208-5 09/09/2021
Storm Water Permitting Requirements Under the Montana Pollutant Discharge Elimination System (MPDES) 208-6 03/16/2017
Storm Water Permitting Requirements Under the National Pollutant Discharge Elimination System (NPDES) 208-7 03/16/2017
Increase In Turbidity 208-8 10/08/2015
Noise Impact 208-9 05/24/2012
Contractor Administration and Time
Status of Utilities 108-1 01/01/2003
Subcontracting Consultants 108-3 02/27/2014
Specialty Items 108-4 04/15/2008
Notice to Bidders 108-5a 11/21/2008
Notice to Bidders 108-5b 03/07/2011
Contract Time 108-6 01/21/2016
Contract Time – Flex Time Proceed Date 108-7 01/21/2016
Contract Time – Completion Date 108-8 01/21/2016
Contract Time – Calendar Day 108-9 01/21/2016
Expedited Notice to Proceed 108-10 11/03/2011
Construction
Moisture Sensitive Soils 203-1 09/11/2014
Portable Self-Contained Communication Trailer 210-1 08/13/2020
Pugmill Mixing 301-1 01/01/2003
Blending Material 301-3 10/10/2019
Ride Specification Category (Single) 401-12 12/13/2012
Ride Specification Categories (Multiple) 401-12a 02/27/2014
Ride Specification 401-13 02/27/2014
Emulsified Asphalt CHFRS 2P 402-3 10/10/2019
Cold Milling 411-1 10/11/2012
Base Price for Concrete 551-1 12/17/2020
Plug Ends and Abandon Pipe 602-2 09/11/2014
Special Installation of Pipe 603-1 10/08/2015
Corrugated Polyethylene Approach Pipe 603-2 12/12/2019
Precast Reinforced Box Culverts 603-3 02/18/2016
Basic Bid Pipe - Concrete 603-4 06/12/2014
Reinforced Concrete Pipes, Boxes, Inlets and Manholes 603-7 12/13/2018
Impact Attenuator 606-2 09/11/2014
Impact Attenuator - Temporary 606-3 01/21/2021
Wildlife-Friendly Farm Fence 607-1 05/24/2012
Concrete Warranty 608-1 04/23/2020
Crossover Reclamation 610-1 04/29/2021
Digitally Printed Signs 704-1 12/09/2021
Traffic Control
Crossover Construct, Maintain, and Close 618-1 10/05/2011
Crossover Construct, Maintain, and Remove 618-2 10/05/2011
Crossover Traffic Control 618-3 10/05/2011
Traffic Control per Mile (km) 618-4 09/12/2013
Department Furnished Variable Message Signs 618-5 02/27/2014
Traffic Control – USAF Convoys 618-6 04/23/2020
Traffic Control – Day 618-7 07/14/2022
Traffic Control Options 618-8 08/06/2015
Wide Load Accommodations 618-9 07/15/2021
Wide Load and Super Load Accommodations (Interstate) 618-9a 09/09/2021
Traffic Actuated Temporary Signals 618-10 12/17/2020
Temporary Barrier Rail 618-11 07/15/2021
Smart Workzone Walkback Flagger Replacement Option (End Of Queue Detection And Warning) 618-13 08/13/2020
Miscellaneous
Motorcycle Advisory Signs 619-2 07/16/2020
Reset Logo and TODS Signs 619-3 05/23/2013
Thermoplastic Treatment 620-2 08/16/2011
Geogrid 622-1 02/27/2014
Project Specific Specials
CEI Administered Projects 100-1 07/07/2020
CEI Services Additional Requirements 100-2 07/07/2020
A+B Bidding 100-3 12/09/2021
Contract Incentive-Disincentive 100-4 12/09/2021
Ride Specification - Percent Improvement 100-5 04/14/2022